How Do I Configure A Task Host in PDM

Before you can use PDM to run a convert task you will need to set up the computer your using as a task host.

1. Once logged in to PDM find the blueberry in the system tray and select Task Host Configuration.

2. Select the permit option for the task.
3. Configure the task in the Administrator tool by double clicking on the task and selecting the host under the Execution Method tab.

4. Now you should be able to RMB on a drawing and convert to PDF.

For a closer look at the process, watch the video below.